A&R Land Services is a veteran and fireman owned crew doing site prep for new construction in Sanford and across Lee County. One estimate covers clearing, grading, pad and drive, and the owner is on the machine for all of it.
Driveways on Sanford build sites take a beating during construction. Concrete trucks, lumber deliveries, the well rig. We base the drive with enough stone to carry that traffic through the build and set a construction entrance at the road so Lee County inspectors don't see mud on the pavement.



Sanford ground conditions and how they shape site prep
Sanford is where three kinds of ground collide. The north and west of town sit in the Deep River Triassic basin — Creedmoor, White Store and Mayodan clays over red shale and sandstone that are slick when wet and brick-hard when dry, with the old brick-clay pits to prove it. East toward the Harnett line the land drops onto the Sandhills edge, where Blaney, Vaucluse and Wagram sands drain in minutes and grow longleaf and turkey oak. South toward Carthage you climb back onto slate-belt Badin and Tatum soils. The Deep River, Cape Fear and Little Buffalo Creek carry the drainage, and the bottoms are privet, box elder and sweetgum.
Around Tramway, Carthage Street and San-Lee Park, the properties we're usually called to look like this:
- Builder lots around Tramway, Carolina Trace and the US-421 bypass needing lot clearing and pad prep
- Mobile home and modular sites on rural lots needing a pad, septic area and gravel drive
- Deep River and Cape Fear hunting and recreation tracts needing trails, firebreaks and a camp site
What site prep jobs look like around Sanford
If you're near San-Lee Park or Carolina Trace, odds are your situation is one we've already worked: builder lots around Tramway, Carolina Trace and the US-421 bypass needing lot clearing and pad prep, or lots where a previous site prep was left half-done.
The site prep approach for Lee County ground is the same either way — look first, quote in writing, bring the right attachment, walk it with you when it's done.
If you're just outside Sanford — Liberty, Cary, Apex or anywhere between — you're still inside our regular range.
Why Sanford property owners call A&R
Our Sanford site prep estimates are sequenced and itemized. You see what clearing costs, what the pad costs, what the drive costs. If you want to phase it, you can.
Call or text (336) 392-8138 for a free site prep estimate in Sanford. Bring the site plan and the septic evaluation if you have them, and we'll walk the lot with you.
Site Prep in Sanford: questions
How long does site prep take?
An open lot with a pad and a short drive can be done in two or three days. A wooded lot with heavy clearing, stumps, a long driveway and a sloped pad can run a week or more, and wet weather adds to that because clay can't be graded or compacted when it's saturated. We give a realistic schedule in the estimate and keep your builder informed.
How much does site prep cost for a new house in North Carolina?
It ranges widely because site prep is really five or six jobs rolled together. An open, fairly flat lot with a short driveway is the low end — mostly grading and a pad. A wooded, sloped lot with a long drive, big trees and imported fill is the high end. Clearing and the driveway are usually the two biggest line items. We walk it, sequence it, and give you one written price for the package.
How far is A&R Land Services from Sanford?
We're based in Greensboro, about 1 hour from Sanford. Lee County is inside the radius we work every week, so there's no long-haul mobilization charge built into your estimate.
Do you handle site prep near Tramway and Carthage Street?
Yes. We work throughout Sanford and the surrounding Lee County area, including properties around Tramway, Carthage Street and San-Lee Park. If you're outside the town limits, send the address and we'll confirm it's in range.
What should I expect from a site prep job in Lee County?
Family land getting a shop, barn or second residence is the most common version of it around Sanford. Topsoil stripped and saved, site rough graded with drainage shaped, pad built in compacted lifts to elevation, drive cut and based with stone, construction entrance set at the road. Erosion control and permit requirements over an acre is the factor that moves the price most on Lee County jobs, and we'll walk through it with you on site.