Veteran & Fireman Owned · Land clearing, forestry mulching & grading · Greensboro, NC & the Piedmont TriadCall or text (336) 392-8138
Driveways & Roads · Henry County · 1 hr 5 min from Greensboro

Farm Roads for Martinsville & Henry County

Lanes you can drive a truck and trailer down in February — cut, ditched, piped and based.

Timber tracts, hunting land and working farms around Martinsville all need access, and most of what we build in Henry County is a lane that follows the ground, sheds water and carries weight at the crossings. Free estimates, and we'll flag the route with you.

Entrances off state roads around Martinsville need an NCDOT driveway permit even for a farm lane, and the culvert has to meet their size. We've been through that with enough Henry County landowners to tell you what the district office will want.

Long gravel farm road through bare winter woods with mulched edges and the track loader at the far end
Access road through the woods, edges cleared, machine at the top of the hill
Kubota SVL97-2 track loader with Fecon forestry mulcher head working through brush and saplings in a Piedmont hardwood stand
Fecon mulcher head on the SVL97 — one pass takes brush and saplings to chips
Forestry mulcher threading between mature oak trunks while clearing understory
Selective clearing — keeper hardwoods stay, everything under them goes

Martinsville ground conditions and how they shape farm roads

Virginia's 10,000-square-foot erosion and sediment control threshold applies and Henry County administers it, so even a modest clearing job near a house often needs a plan. The Smith River has a public water intake and a riparian corridor. The slope is what we plan around: we mulch on contour, leave the root mat on anything steep, and put water bars on roads and trails. Gneiss and schist are close to the surface on the ridges, so pads and trenches get probed before we price them.

Around the Smith River, Axton and NC-57 / VA-57, the properties we're usually called to look like this:

  • Smith River and Philpott cabin sites wanting clearing on a grade and a path to the water
  • Working cattle farms with fence rows lost to rose and autumn olive and farm roads that wash every spring
  • Commercial parcels around Commonwealth Crossing and the US-220 corridor needing clearing and rough grading

What farm roads jobs look like around Martinsville

One job we see over and over near NC-57 / VA-57: Smith River and Philpott cabin sites wanting clearing on a grade and a path to the water. That's textbook farm roads work, and it's usually a one-mobilization job for us.

Out toward Ridgeway the pattern changes — more Haul roads for timber sales and firewood cutting. The approach is the same, the time on site is what moves.

Either way, the first question we ask on a Martinsville site walk is what the ground needs to do afterward, because that decides how far we take it.

Danville, Madison and Eden are in the same loop as Martinsville for us — same crew, same pricing basis.

Why Martinsville property owners call A&R

On a Martinsville farm road, Clark is on the machine — veteran, firefighter, owner. He walks the route with you, flags it with you and cuts it himself. There's nobody between you and the operator.

Reach out to A&R Land Services for farm road and access lane work anywhere in Henry County — new cuts, reopened logging roads, crossings and entrances.

Farm Roads in Martinsville: questions

Do farm roads need gravel the whole length?

Usually not. Firm, well-drained Piedmont clay with a proper crown and ditches will carry a tractor and a pickup most of the year without stone. Stone goes where the road sees the most traffic and the most water — the entrance, crossings and wet spots — and on the full length only if the road has to carry heavy trucks through the winter.

Do I need a permit to build a road on my farm?

Interior farm roads on your own land generally don't need a permit, and agricultural and forestry activities have exemptions from some state rules. Where you need to be careful is crossing a stream — buffer rules and sometimes a permit apply — and disturbing more than an acre outside an agricultural exemption. A new entrance on a state road needs an NCDOT driveway permit. We'll walk you through what applies.

How far is A&R Land Services from Martinsville?

We're based in Greensboro, about 1 hour 5 minutes from Martinsville. Henry County is inside the radius we work every week, so there's no long-haul mobilization charge built into your estimate.

Do you handle farm roads near the Smith River and Axton?

Yes. We work throughout Martinsville and the surrounding Henry County area, including properties around the Smith River, Axton and NC-57 / VA-57. If you're outside the town limits, send the address and we'll confirm it's in range.

What does farm roads typically involve on a Martinsville property?

Lanes that cross a draw, creek bottom or seasonal wet area is the most common version of it around Martinsville. ABC at the entrance, crossings, soft spots and anywhere the road has to carry weight in the wet. Cut banks seeded and strawed. Drive it with you before we leave. Terrain — flat ground cuts fast, side slopes take more shaping and ditching is the factor that moves the price most on Henry County jobs, and we'll walk through it with you on site.

Farm Roads in Martinsville, done right the first time.

Call, text, or send a few photos and the address. Clark walks the property with you and puts a real number on the work.

(336) 392-8138Request an estimate